New pile system confined with frt composite materials

Project Details

Description

The proposal for the innovation case corresponds to a construction system for pre-excavated or in situ piles and micropiles, externally reinforced with fiberglass and with dimensional control

Objective

Develop a construction system for micropiles and insitu piles jacketed with fiberglass and the design method of the piles.

Expected results

Invention patent, prototype and pilot test
StatusFinished
Effective start/end date15/07/1930/07/21

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.